Document
|
Author Clare Parker & Carina King |
Abstract This paper outlines the Human Factors (HF) integration work that was undertaken at a Sellafield Limited (SL) nuclear waste management facility in the north of the UK. The project consisted of the design and build of a new facility to store Intermediate Level Waste (ILW). The work was delivered by HF specialists at Risktec Solutions Ltd (Risktec) and involved multiple HF activities. A local operability review is presented as a case study that considered the environmental aspects of the new facility. This paper demonstrates the importance and impact of HF integration on a large-scale project. |